REGION V

Labor Cost per Construction Scopes of Work (REGION V)

Below are labor costs are typically applied to the following construction activities:

  • Labor cost for Earthworks
  • Labor cost for Concrete Works
  • Labor cost for Rebar Works
  • Labor cost for Formworks and scaffolding
  • Labor cost for CHB laying and masonry works
  • Labor cost for Plastering
  • Labor cost for Ceiling Works
  • Labor cost for Drywall Works
  • Labor cost for Tile Works
  • Labor cost for Waterproofing Works
  • Labor cost for Roofing Works
  • Labor cost for Roofing Works (Structural Framing)
  • Labor cost for Painting works
  • Labor cost for Plumbing and Sanitary Works
  • Labor cost for Electrical Works
  • Labor cost for Mechanical and Fire Protection Works

How Labor Cost per Scope Is Estimated

Labor cost per scope of work is usually derived from:

  • Standard productivity rates
  • Daily labor wage rates
  • Project duration and manpower requirements
  • Site conditions and access
  • Skill level and supervision requirements

These factors are combined to produce a unit labor cost suitable for estimating.

ItemLabor DescriptionUnitLabor Cost per Unit (PHP)Remarks
Earthworks
Structure Excavation (Hard Rock)cu.m1271.37With Equiment
Structure Excavation (Soft Rock)cu.m355.01With Equiment
Structure Excavation (Common Soil)cu.m236.98With Equiment
Structure Excavation (Common Soil)cu.m606.06Manual/By Hand
Embankment from Common Borrow cu.m163.38With Equiment
Soil Poisoningsq.m39.1
Concrete Works
Structural Concrete for Sub Structure (Footing & FTB)cu.m1984.11Manual Mixing w/ bagger mixer
Structural Concrete for Super Structure (Column, Beam & Slab)cu.m2623.43Manual Mixing w/ bagger mixer
Rebar Works
Fabrication and Installation of Reinforcing Steel of Reinforced Concrete Structures for Two up to Five Storeykg12.58with Bar Bender and Bar Cutter
Fabrication and Installation of Reinforcing Steel of Reinforced Concrete Structures for 1-Storey Residentialkg11.32with Bar Bender and Bar Cutter
Formworks
Fabrication ,Installation & Stripping of Formworks and Falseworks (for one-storey building)sq.m377.62
Masonry Works
CHB Laying (4" CHB)sq.m177.7Including RSB Installation
CHB Laying (6" CHB)sq.m213.75Including RSB Installation
CHB Plastering (20mm Thick)sq.m89.02
Ceiling Works
Hardiflex/Plywood on Metal Frame Ceilingsq.m309.58
Hardiflex/Plywood on Wod Frame Ceilingsq.m258.44
Gypsum Board on Metal Frame Ceilingsq.m287.17
Acoustic Ceiling Panel on Metal Framing (2ft x 2ft)sq.m287.17
Perforated Aluminum Ceiling Panelssq.m504.34
Drywall Works
Hardiflex/Ordinary Plywood on Metal Frame Double Wall Partitionsq.m495.89
Doors & Windows
Hollow Steel Door/ Steel Flush Door/ Grille Door/ Steel Louver Doorsq.m1564.64Installation Only
Fire Rated Fire Exit Steel Doorsq.m1856.01Installation Only
Aluminum Glass Door (Sliding Type/Swing Type)sq.m1188.68Installation Only
Aluminum Glass Window (Sliding/ Casement/Awning/ Fixed Type)sq.m858.49Installation Only
Jalousie Window (Glass)sq.m1144.65Installation Only
Frames (Jambs, Sill, Head, Transoms and Mullions)set618.11Installation Only
Tile Works
Glazed Tiles and Trimssq.m735.36
Unglazed Tiles/ Granite Tiles/ Synthetic Granite Tilessq.m514.75
Wood Tiles (Narra/Tanguile, Others)sq.m643.44
Laminated Wood Tiles sq.m514.75
Vinyl Tilessq.m112.66
Pea Gravel/washout Finishsq.m215.58
Waterproofing Works
Waterproofing Cement Basesq.m164.83
Liquid Waterproofing/Cementitious Waterproofingsq.m53.54
Built-up and Performed Membranesq.m64.32
Roofing Works
Corrugated Metal Roofingsq.m185.36
Fabricated Metal Roofing Accessory (Ridge/Hip Rolls/Flashings/Counter Flashing/Valley Roll)m30.91
Prepainted Metal Sheets (Corrugated, Short Span/ Long Span)sq.m185.36
Reflective Insulationsq.m69.21
Roofing Works (Structural Framing)
Structural Steel Roof Framing including cross bracingkg27.29
Structural Steel Purlinkg15.66
Metal Structure Accessories (Anchor Bolts)pc30.91
Metal Structure Accessories Turn Buckle)pc46.36
Painting Works
Masonry/Concrete Painting sq.m193.8
Metal/Wood Painting)sq.m215.33
Varnishing Workssq.m103.16
Ducco Finishedsq.m269.17
Plumbing and Sanitary Works
Water Closet / Urinal Kitchen Sink/Scrub Up Sink/Slop Sink set618.11
Floor Drain Platesset123.62
Shower head/ Shower Valveset309.06
50 mm Ø -100 mm Ø PVC Pipe, Series 600/ Series 1000m128.27
150 mm Ø -300 mm Ø PVC Pipe, Series 600/ Series 1000m96.2
50 mm Ø -100 mm Ø High Density Polyethylene (HDPE) Pipem128.27
150 mm Ø -300 mm Ø High Density Polyethylene (HDPE) Pipem96.2
13 mm Ø - 50 mm Ø Galvanized Iron Pipepc769.63
65 mm Ø - 150 mm Ø Galvanized Iron Pipepc577.22
13 mm Ø - 50 mm Ø Polyprophylene Random Copolymer (PPR-C) Pipe, PN 10/ PN 16/ PN 20pc511.8
63 mm Ø - 100 mm Ø Polyprophylene Random Copolymer (PPR-C) Pipe, PN 10/ PN 16/ PN 20pc384.81
13 mm Ø-50 mm Ø Polyvinyl Chloride (PVC) Pipe, Blue pc384.81
65 mm Ø - 100 mm Ø Polyvinyl Chloride (PVC) Pipe, Bluepc288.61
150mm dia. Concrete Pipe Layingm632.63
200mm dia. Concrete Pipe Layingm692.18
250mm dia. Concrete Pipe Layingm756.83
300mm dia. Concrete Pipe Layingm815.14
350mm dia. Concrete Pipe Layingm873.46
Electrical Works
15 mmØ - 25 mmØ x 3.00 m Rigid Steel Conduit (RSC)/ Intermediate metal Conduit (IMC)/ Electrical Metal Tubing (EMT)m231.85
32 mm Ø - 40 mm Ø x 3.00 m Rigid Steel Conduit (RSC)/ Intermediate metal Conduit (IMC)/ Electrical Metal Tubing (EMT)m247.24
50 mm Ø - 65 mm Ø Rigid Steel ConduiU Intermediate metal Conduit (IMC)/
Electrical Metal Tubing (EMT)
m598.95
80 mm Ø - 100 mm Ø Rigid Steel Conduit ( RSC) Intermediate metal Conduit (IMC)/
Electrical Metal Tubing (EMT)
m618.11
15 mm Ø - 25 mm Ø Flexible Metal Conduitm154.53
15 mm Ø - 32 mm Ø Polyviny;l Chloride (PVC (Pipes)m87.45
Junction/ Utility/ Pull/ Square Boxpc63.16
1.6 mm^2 - 5.5 mm^2 Electric Wire (TW/THHN/TWHN 2)m12.36
8 mm^2 - 22 mm^2 Electric Wire (TW/THHN/TWHN 2)m21.63
30 mm^2 - 38 mm^2 Electric Wire (TW/THHN/TWHN 2)m84.48
50 mm^2 - 60 mm^2 Electric Wire (TW/THHN/TWHN 2)m104.6
80 mm2 - 125 mm2 Electric Wire (TW/THHN/TWHN 2)m168.97
150 mm^2 - 250 mm^2 Electric Wire (TW/THHN/TWHN 2)m442.72
325 mm^2 - 400 mm^2 Electric Wire (TW/THHN/TWHN 2)m518.81
500 mm^2 Electric Wire (TW/THHN/TWHN 2)m622.73
2.00 mm^2 - 5.5 mm^2 Bare Copper Wirem15.45
8.00 mm^2 - 22 mm^2 Bare Copper Wirem30.91
30.00 mm^2 - 38 mm^2 Bare Copper Wirem40.23
50.00 mm^2 - 60 mm^2 Bare Copper Wirem48.27
80.00 mm^2 - 125 mm^2 Bare Copper Wirem80.46
200.00 mm^2 - 250 mm^2 Bare Copper Wirem124.51
Switchesset173.68
Single Convenience Outlet/Receptacle, Grounding Type (GT)/ Heavy Duty Convenience Outlet/Receptacle, Grounding Type (GT)/ Weather Proof Single Convenience Outlet/Receptacle, Grounding Type (GT)/ Pop-up Type/Floor Triplex Convenience Outlet/Receptacle, Grounding Type (GT)set39.47
Duplex Convenience OutleVReceptacle, Grounding Type (GT) / Weather Proof Duplex Convenience Outlet/Receptacle, Grounding Type (GT)/ Special Purpose Convenience OutleVReceptacle, Grounding Type for ACU, WH, etc/ Explosion Proof Type Duplex Convenience Outlet/Receptacle, Grounding Type (GT)/ Duplex Convenience Outlet/Receptacle with Ground Fault Circuit lnterupterset47.37
Pop-up Type/Floor Single Convenience Outlet/Receptacle, Grounding Type (GT)/ Pop-up Type/Floor Duplex Convenience Outlet/Receptacle, Grounding Type (GT)/ Explosion Proof Type Single Convenience Outlet/Receptacle, Grounding Type (GT)/ Single Convenience Outlet/Receptacle with Ground Fault Circuit Interrupterset23.68
Panel Board with Main Breaker/Branches, 3 wires, 1 neutral, 250 Amp - 400 Ampset3148.47Labor Includes removal of circuit breaker, Alignment, mounting and removal of hub/hole,installation of pipe/fittings, re-installation of circuit breaker ,termination of wires, testing and commisioning.
Panel Board with Main Breaker/Branches, 3 wires, 1 neutral, 50 Amp - 200 Ampset1924.07Labor Includes removal of circuit breaker, Alignment, mounting and removal of hub/hole,installation of pipe/fittings, re-installation of circuit breaker ,termination of wires, testing and commisioning.
NEMA I (Enclosed Circuit Breaker) Single Phase or Three Phase Commercial/Industrial Typeset280.96Labor Includes removal of circuit breaker, Alignment, mounting and removal of hub/hole,installation of pipe/fittings, re-installation of circuit breaker ,termination of wires, testing and commisioning.
NEMA 3R (Enclosed Circuit Breaker) Single Phase or Three Phase Commercial/lndustrial Type set210.72Labor Includes removal of circuit breaker, Alignment, mounting and removal of hub/hole,installation of pipe/fittings, re-installation of circuit breaker ,termination of wires, testing and commisioning.
Fluorescent Lighting Fixture with Ballast /Light Emitting Diode (LED) Bulb, 1 Bulbset309.06Labor Includes installation of scaffolding .Alignment,of fixtures,disassemble of lighting fixture permanent installation of insulation materials,testing and commisioning.
Fluorescent Lighting Fixture with Ballast /Light Emitting Diode (LED) Bulb, 2 Bulbsset355.41Labor Includes installation of scaffolding .Alignment,of fixtures,disassemble of lighting fixture permanent installation of insulation materials,testing and commisioning.
Fluorescent Lighting Fixture with Ballast /Light Emitting Diode (LED) Bulb, 3 Bulbsset386.32Labor Includes installation of scaffolding .Alignment,of fixtures,disassemble of lighting fixture permanent installation of insulation materials,testing and commisioning.
Mechanical & Fire Protection Works
Sprinkler Head, upright/pendent/wallpc53.02
Alarm Check Valvepc1123.84
Flow Meterpc842.88
OS & Y Gate Valve 175 psipc842.88
Pressure Gaugepc106.05
Pressure Relief Valve, Floor Control Valvepc842.88
25 mm -50 mm Black Iron (B.I.) Pipe Layingm437.29Straight line installation for ceiling height of up to 3.5m, Labor Output includes setting , scaffolding, cutting fixing of Pipe from elbow ,tee, flange, valve and painting.
65 mmØ -150 mmØ Black Iron (B.I.) Pipem466.44Straight line installation for ceiling height of up to 3.5m, Labor Output includes setting , scaffolding, cutting fixing of Pipe from elbow ,tee, flange, valve and painting.
Fire Hose Valve siames 150 mm Ø x 2 w x 65 mm Ø with capset1049.49
Fire Hose Cabinetset280.96Installation Only
Fire Extinguisherset34.44Installation Only

🧱 Construction Labor Cost Guide in the Philippines (2026)

Construction labor costs in the Philippines vary significantly by region, trade, and project complexity. Rates in Metro Manila and major cities are generally higher due to demand, cost of living, and project scale, while provincial areas often have lower daily wages. Understanding how labor pricing works is critical for contractors, engineers, and homeowners to prepare accurate project estimates and realistic budgets.

This guide explains why labor costs differ, what affects pricing, and how to estimate labor properly using standard construction practices in the Philippines.

👉 For material reference, see our [Material Price List Philippines]


📍 How Labor Costs Vary by Region

Labor rates are influenced by location-based economic conditions. Below is a typical daily labor rate comparison (reference only):

📊 Sample Daily Labor Rates by Region (PHP)

Trade / RegionMetro ManilaProvincial CitiesRural Areas
Mason₱900 – ₱1,200₱700 – ₱900₱600 – ₱800
Carpenter₱900 – ₱1,300₱700 – ₱1,000₱600 – ₱850
Steelman₱900 – ₱1,200₱700 – ₱950₱600 – ₱850
Helper / Labor₱600 – ₱800₱500 – ₱650₱450 – ₱600

⚠️ Note: Actual rates may vary depending on experience, availability, and urgency of the project.


⚙️ Factors That Affect Construction Labor Pricing

Several factors determine labor cost per scope of work:

1️⃣ Location & Accessibility

Remote areas may have lower daily wages but higher indirect costs due to transportation and accommodation.

2️⃣ Scope & Complexity of Work

Specialized tasks (tiling, formworks, architectural finishes) cost more than basic labor.

3️⃣ Project Duration

Short-duration or rush projects often require higher daily rates.

4️⃣ Skill Level & Productivity

Experienced workers may charge more but finish faster and with better quality.

5️⃣ Market Demand

High construction activity increases labor demand, pushing prices up.

🧮 Labor Cost Breakdown Example (Masonry Works)

Example: CHB Wall Construction (30 sqm)

Assumptions:

  • Productivity: 8–10 sqm/day/mason
  • Rate: ₱900/day (Metro Manila)

📊 Sample Labor Computation

ItemValue
Wall Area30 sqm
Productivity9 sqm/day
Required Mason Days3.33 days
Daily Rate₱900
Total Mason Cost₱3,000
Helpers (1 helper @ ₱700/day for 3.33 days)₱2,333
Total Labor Cost₱5,333

👉 Use our [Masonry Work Calculator] to automate this computation instantly.


🛠️ How to Use Labor Costs in Your Estimate

1️⃣ Identify the scope of work (masonry, concrete, carpentry, etc.)
2️⃣ Use quantity calculators to determine work volume
3️⃣ Apply regional labor rates
4️⃣ Add 5–10% contingency for price fluctuations